Ticker

6/recent/ticker-posts

Forecast of population for water supply is done using

Forecast of population for water supply is done using | UK Combined AE 2012
U.K. Combined A E Paper II 2012
⭕ (a) Arithmetic Mean Method
⭕ (b) Comparative Method
⭕ (c) Graphical Method
⭕ (d) All the above
Explanation: Forecasting population is essential for water supply planning. All the listed methods are valid. Here are the commonly used ones:
  • Arithmetic increase method
  • Geometric increase method
  • Method of varying increment
  • Decreasing rate of growth method
  • Simple graphical method
  • Comparative graphical method
  • Master plan or zoning method
  • Logistic curve method
These methods help predict future population to ensure adequate water supply infrastructure.

Population Forecasting Methods in Water Supply

Forecasting population is a crucial step in the design and planning of water supply systems. It helps estimate the future water demand of a city or area.

Why It’s Important:

  • Helps in planning for future urbanization.
  • Ensures proper sizing of pipes, reservoirs, and treatment units.
  • Reduces the risk of shortages and system failures.

Conclusion:

The correct answer is All the above. All three — arithmetic, comparative, and graphical — are part of multiple standard forecasting methods used in engineering and urban planning.

Post a Comment

0 Comments