UPPSC State Eng. A.E. 2004 (II), UPPSC Civil Eng. A.E. 2013 (II)
⭕ (a) Satellite station
⭕ (b) False station
⭕ (c) Supplementary station
⭕ (d) Pivot station
Extra Information
In geodetic surveying, sometimes the direct line of sight between two main triangulation stations is blocked by an obstruction such as a building or hill. In such cases, an alternative station is selected close to the main station to bypass the obstruction and maintain accuracy. This station is known as a pivot station.
Key Concepts:
- Used when direct line between triangulation stations is blocked
- Placed close to the main station
- Does not affect the geometry of triangulation